105. Sections 37 to 40.2, 43 to 49, 52 to 55, 57 to 60, 63 to 67 and 69 to 79 apply to the operation of construction or demolition waste landfills, with the necessary modifications and in particular as follows: the maximum distance authorized under subparagraph 2 of the third paragraph of section 65 for the installation of groundwater quality monitoring wells must not exceed the perimeter of the landfills.
The operation of the landfills is also subject to the following conditions:(1) subject to subparagraph 2, construction or demolition waste deposited in the landfills must, at least once a month during the operation period, be graded and covered with a layer of soil or material that— consists of less than 20% by weight of particles 0.08 mm or finer in diameter;
— has a constant minimum hydraulic conductivity of 1 x 10-4 cm/s;
— does not contain material that is not accepted in such a landfill;
— accomplishes the purposes referred to in the second paragraph of section 41;
(2) bituminous coated material containing asbestos must be covered with other materials on being unloaded in a disposal area. The words “containing asbestos” have the same meaning as in the fourth paragraph of section 41;
(3) (subparagraph revoked).
The soil used to cover construction or demolition waste may also contain contaminants in a concentration equal to or lower than the limit values set out in Schedule I to the Land Protection and Rehabilitation Regulation (chapter Q-2, r. 37). Those limit values do not apply to contaminants that do not originate from human activity. The operator must take or have taken, for each batch of 4,000 tons or less of the same material used for the purpose of covering residual materials, or once a year where the quantity of that material used annually is less than 4,000 tons, and each time that a material of a different type is used, a sample of that material for it to be measured and analyzed to ensure compliance with the requirements of subparagraph 1 of the second paragraph. If two or more materials of different types are mixed together to be used for such a purpose, they must be mixed evenly and the result of the mixing must comply with the requirements of subparagraph 1 of the second paragraph. The results of the measurements and analyses must appear in the report referred to in section 52.
O.C. 451-2005, s. 105; O.C. 451-2011, s. 25; 868-2020O.C. 868-2020, s. 3011.